Downloads


Annual Report 2024
18.06.2025
Annual Report 2024
Arbeitsbericht NAB 09-28
28.05.2025
Arbeitsbericht NAB 09-28

Vorschlag geologischer Standortgebiete für das SMA- und das HAA-Lager

Technical Report NTB 23-10
05.03.2025
Technical Report NTB 23-10

In-situ Experiments on Bentonite Longterm Stability and Radionuclide Mobility at the Bentonite–Crystalline Interface at Grimsel Test Site

Securing the safest site – The way to a deep geological repository for Switzerland
19.11.2024
Securing the safest site – The way to a deep geological repository for Switzerland
Annual Report 2023
02.07.2024
Annual Report 2023

The Nagra Annual Report from the year 2023.

Technical Report NTB 23-11
26.01.2024
Technical Report NTB 23-11

Degradation of Organic Materials in an L/ILW Repository

Arbeitsbericht NAB 22-04
26.01.2024
Arbeitsbericht NAB 22-04

TBO Bachs-1-1: Data Report

Technical Report NTB 23-03
23.01.2024
Technical Report NTB 23-03

Geochemical Evolution of the L/ILW Near-Field

Arbeitsbericht NAB 22-26
11.01.2024
Arbeitsbericht NAB 22-26

Ergänzung Schwachbebennetz in der Nordschweiz: Installation Bohrlochseismometer Bülach1-1

Checkout
...